top of page
Search

Outboard Trawler Project

  • Writer: Gord and Donna
    Gord and Donna
  • Apr 28, 2023
  • 1 min read

April 28, 2023


We've been away for a few days but we're back at it now.


The day before we left, while I was working at the boat, a freak windstorm came ripping through the harbour. I had removed a temporary motorwell cover and tied it to the cabin roof. The wind picked it up like a kite and swung it about, hammering about six dents into the cabintop and breaking a corner of the cover.


ree

I sanded the dents yesterday and mixed a batch of epoxy to fill them.


ree

This morning, I sanded the epoxy putty and painted over the area with a bit of the original 2-part polyurethane. Problem solved!


ree

Donna continues to paint Kiwigrip on the interior walls.


ree

The little boat just keeps getting nicer and nicer.


ree

Today, the new docks arrived.


ree

We had front-row seats from Helen Back's cockpit.


ree

The company brought along an excavator on a barge, along with all the cement 'dock anchors'. I imagine it will be another day or two before the docks are all secured in place.


ree

Thanks for reading our blog!


 
 
 

Comments


  • Google+ Black Round
  • Facebook Black Round
  • Twitter Black Round

© 2015 by MIDWAY Blog

Proudly created with Wix.com

bottom of page